Tuesday, December 22, 2009
New Caledonia project(Pipe laying)
Map of New Caledonia
Mob in Singapore
Mob in Singapore
Bad weather, Transit to New Caledonia
Bad Wx
Bad Wx
Arr Noumea
Noumea
Starting Point,Location
Pipe laying Diagram
Floatel
Floatel
Survey screen
Pick up and hold the pipe for connecting
Supporting crafts
Supporting craft
Length 500 mtrs section, towed by tugs
One section completed
Pick up and hold the line for connecting
ROV trial
Connecting
Sinking the pipeline
Location to Noumea
Residential in Noumea
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment